Vytas believes its “On Demand” hydrogen project will have a significant positive impact on economies and industry by supporting the renewable energy transition.
Our hydrogen is process is recyclable, utilises non-beneficial water such as sea water, and the hydrogen is produced “On Demand” only moments before being consumed. Being on demand mitigates the costs and safety challenges of storage and logistics.
- Vytas is moving towards commercial pilot plants with potential partners in defence, mining and an indigenous owned energy company.
- The project is in the design and approvals phase, with the scale likely to be in the range of 300kw-500kw.
- Opportunities to utilize off-the-shelf equipment have been identified, which may result in slightly higher costs than producing the equipment internally but will likely reduce commissioning times and execution risk.
- Vytas will optimize the plant based on a range of reagents, targeting reducing costs and energy inputs.
- Vytas would like to thank the WA Government, the traditional owners, and the local stakeholders for their our White Peaks project and look forward to receiving the assay and physical test work results in the coming weeks.